Energy infrastructure
Power for AI.
How wind generation, battery storage and flexible compute can share a constrained grid connection.
Explore campus dispatchCampus dispatch
Compare three illustrative operating conditions. Each holds wind availability and the grid limit constant for the duration shown.
Facility power balance
2-hour operating window
- Campus demand
- 100 MW
- Wind supplied
- 45 MW
- Grid import
- 30 MW
- Battery discharge
- 25 MW
- Wind
- Grid
- Battery
- Shortfall
Demand covered. The battery delivers 50 MWh over 2 hours.
From generation to compute
Follow the wind-to-grid connection
Site power bus
Wind power
Wind output is measured at the site bus after wake, availability and electrical losses. Available generation serves campus load first.
Dispatch assumptions
The campus starts with a 100 MW facility load, including cooling. Flexible compute can reduce demand in the low-wind case. Wind and utility power meet demand before the battery discharges. The model caps battery output at 50 MW and limits discharge to 160 MWh of usable AC energy over the operating window. It does not model charging, transients or changes within an hour.